Project information
Gas turbines with ultrafast start-up system
December 2024 - May 2025
Funding entity Unelco Generación
The aim of the collaboration is to ellaborate a report on gas turbines with ultrafast start-up system. The report will describe the system, the techanical and economic advantages and the regulatory modifications needed to make it feasible in the Spanish island systems.
Research topics:
- Stability: Large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models
- Isolated systems: Islands, microgrids, off-grid
UnelcoArranqueUltrarapidoTurbinasGas